Cable for OAC 100% Manufactured
SUB.CO announced its 9,800km Oman Australia Cable (OAC) has now been fully manufactured with load #1 of 2 assembled, tested and now being loaded onto a freighter to transfer to the main-lay ship for installation from March, 2021